Lisa Chen
PE/PMP Civil Engineer
Colorado
108
Articles
Categories
About
Lisa Chen is a licensed PE and PMP with 12 years of project management experience on commercial and public works projects ranging from $2M to $45M.
She covers infrastructure policy, federal and state funding, major project news, and construction technology. Her reporting translates government spending decisions and contract awards into contractor-level analysis.
She also tracks technology adoption in the field — BIM, drones, AI scheduling, modular construction — with a focus on what's actually being used on real projects versus what's being marketed at trade shows.
Beat
Infrastructure, public works, construction technology, project delivery
Lisa Chen
CommercialCurtain Wall Cost Per Square Foot 2026: What Sets the Price
What drives curtain wall cost per square foot in 2026: unitized vs stick vs window wall, glass makeup, aluminum extrusion PPI up 26.3%, tariffs, lead times.
InfrastructureUS Tunnel Construction Costs: Why Subways Cost So Much
NYU's Transit Costs Project found Second Avenue Subway Phase 1 cost 8 to 12 times its low-cost baseline. Where US tunnel construction costs go — stations, labor, procurement and soft costs — and what it means for bidders.
Public WorksState DOT Bid Letting Schedules: How Lettings Work
How state DOT bid letting schedules work, using TxDOT, FDOT, Caltrans and MnDOT calendars, plus prequalification, DBE rules and the federal-aid bidding regs.
Construction ProjectsPrometheus Hyperscale Wyoming Data Center: 1.25 GW Campus
Uinta County approved Prometheus Hyperscale's 1.25 GW off-grid data center campus near Evanston, Wyoming. Permit conditions, court challenge, jobs and what contractors should watch.
Construction ProjectsHRBT Expansion: $3.9B Tunnel Outfitting and 2027 Opening
HRBT Expansion boring is finished and tunnel outfitting is underway. The $3.9B cost, the 46-ft variable-density TBM, the 2022 schedule reset and $90M incentive, and the 2027 completion dates.
Construction ProjectsPotomac River Tunnel: DC Water's $819M Bore and Two TBMs
DC Water's $819M Potomac River Tunnel is its largest contract ever. Two hybrid TBMs, rock to soft ground, five drop shafts, and a 2005 consent decree driving 2030.
Construction ProjectsSecond Avenue Subway Phase 2: Cost, Contractors, and the 2027 TBM Launch
Second Avenue Subway Phase 2 is in heavy civil construction. Contract values, why cost is quoted as both $6.97B and $7.7B, TBM specs, and the 2032 date.
Construction ProjectsHudson Tunnel Project: $16B Cost, Contractor Lineup, and TBM Timeline
All tunnel-boring contracts on the $16B Hudson Tunnel Project are now awarded. Contractors, TBM specs, Palisades geology, and the 2035 schedule.
InfrastructureTraffic Signal Installation Cost Per Intersection (2026)
Traffic signal installation cost per intersection in 2026, from Mesa, AZ project costs ($683K to $1.06M), FDOT component prices, MUTCD warrants and HSIP funding.
InfrastructureWater Tower Construction Cost in 2026
Water tower construction cost in 2026 from real bid tabs: 1-million-gallon composite tanks bid at $6.4M to $7.9M in Texas and $6.6M in Montana.
CommercialMiddle East Construction Megaprojects 2026: The Gulf Reset
Gulf contract awards fell to $213B in 2025 as Saudi giga-projects slowed and NEOM's The Line was paused. What the 2026 reset means for US contractors.
CommercialUK Data Center Construction 2026: London and the Grid Queue
UK data center construction in 2026: London's 8.6% vacancy, a 700 GW grid queue cut to 381.5 GW, AI Growth Zones, and Turner & Townsend's $12.0/W London cost.
EconomyUK Construction Cost Per Square Foot 2026: London $560/SF
UK construction cost per square foot in 2026: London at $6,032/m² (about $560/SF) per Turner & Townsend, ONS output price trends, BCIS forecasts, VAT and conversion.
EconomyCanada vs US Construction Costs 2026: Toronto vs Chicago
Canada vs US construction costs 2026: RLB and Turner & Townsend $/SF for Toronto, Calgary and Vancouver vs Chicago and Dallas, at C$1.43 per US$, plus tariffs.
CommercialEurope's Data Center Boom: All Five FLAP-D Markets, Tracked
Europe data center construction across the FLAP-D markets: CBRE's Q1 2026 inventory, vacancy and rents, grid limits, and the EU and German efficiency rules.
CommercialData Center Construction Costs: Europe vs US Per MW
Data center construction costs Europe vs US: Turner & Townsend puts London at $12.0/W and Frankfurt at $11.6/W vs $13.3/W in Silicon Valley. Grid, rules and labor.
InfrastructureDublin Data Center Moratorium: 22% of Ireland's Power
The Dublin data center moratorium explained: CRU's 2021 direction, EirGrid's Dublin freeze, the December 2025 connection policy, and data centres at 22% of Irish power.
CommercialConvenience Store Construction Cost Per Square Foot
Convenience store construction cost: RSMeans c-store and fast food models, construction price escalation since 2019, EPA tank rules and the scopes that drive a c-store budget.
InfrastructureHow to Calculate Asphalt Tonnage: $65-$110/Ton in 2026
How to calculate asphalt tonnage: L x W x D x 145 lbs/CF / 2,000, worked examples, compaction and waste, plus 2026 plant prices from public bid tabs ($65-$110/ton).
CommercialStrip Mall Construction Cost Per Square Foot
Strip mall construction cost per square foot: RSMeans retail store models, escalation since 2019, Cushman retail market data, shell vs. vanilla box scope and yield-on-cost math.
InfrastructureEV Charging Station Construction Cost: 2026 Guide
EV charging station construction cost: published per-charger hardware and installation data, recent NEVI grant amounts per port, make-ready programs and the 30C credit.
CommercialBank Branch Construction Cost Per Square Foot
Bank branch construction cost: the RSMeans bank model, escalation since 2019, and the vault, security, drive-up and ADA scopes that drive a branch budget.
Public WorksHospital Construction Cost 2026: ~$2M Per Bed, $482/SF
Hospital construction runs nearly $2 million per bed and $482/SF at the national average for a three-story hospital. Acuity, imaging and MEP drivers inside.
InfrastructureSubstation Construction Costs Surge as Grid Demand Hits Record
Transformer producer prices are up 86% since January 2020 (BLS PPI), and power transformers average 128 weeks to deliver. What drives substation costs.
Public WorksTransit Station Construction Cost: 2026 Project Data
Transit station construction cost from official budgets: a $320M Metro infill station, $7.7B for three Second Avenue Subway stations, and FTA's FY2027 pipeline.
InfrastructureIIJA in 2026: $331B Paid Out, How Contractors Get In
IIJA in 2026: $330.6B paid out and $607.5B obligated (USAspending, Aug 2026). Where contractors find infrastructure bill contracts, which programs pay, and the rules.
Public WorksHow to Win Public Works Contracts: 2026 Bidding Guide
Public construction ran at a $547.8B annual rate in Aug 2026 (Census). SAM.gov registration, Miller Act bonds, Davis-Bacon, set-asides and bid rules.
CommercialOffice-to-Residential Conversions: Engineering Challenges
The office-to-apartment pipeline hit 90,300 units in 2026, but most offices can't convert. Floor plate depth, egress, plumbing, seismic and sound rules decide.
Public WorksState DOT Construction Budgets 2026: Where the Money Goes
States put $116.3 billion into highway capital outlay in 2024, per FHWA. Which states build the most, which federal programs fund it, and what changes in 2026.
Commercial2026 Data Center Construction Forecast: What's Coming Next
Data center construction hit an $85B annual rate in Aug 2026 (Census), and AIA forecasts +33% in 2026 and +25% in 2027. What the forecasts say and what to watch.
CommercialAdaptive Reuse Construction Cost vs New Build: The Numbers
Adaptive reuse construction cost vs new build: what public data shows on conversion costs, cheap buildings, the 90,300-unit pipeline, and historic tax credits.
CommercialAI Training Facilities: The Next Wave of Data Center Construction
AI training data centers run 100+ kW racks, need liquid cooling and long-lead power gear. Sourced 2026 cost, capex and pipeline data for contractors.
CommercialBig-Box Retail Sites Are Becoming Housing: What the Data Shows
Big-box retail sites are becoming housing. What Coresight store-closure counts, Macy's 150-store plan and Census construction data say about the demolition-to-apartments pipeline.
CommercialCannabis Facility Construction Shrinks as Oversupply Bites
Cannabis facility construction has shrunk with wholesale prices. Oklahoma grower licenses are down 82% since 2021, Colorado flower is $601/lb, and Oregon demand met 57% of supply.
CommercialClass A Office Construction 2026: Is the Freeze Thawing?
Class A office construction in 2026: Census general office spending is $45.8B a year, down 37% from 2020, while Cushman's pipeline ticked up to 23.0 msf.
CommercialCo-Working Buildout Costs and Design Trends for 2026
Co-working buildouts start from the $162/SF US office fit-out average (Cushman & Wakefield 2026). Flex space is 3.1% of US office inventory and growing 18% a year. Costs, design trends and economics.
CommercialData Center Power Demand Is Reshaping Construction
Data centers used 4.4% of U.S. electricity in 2023 and could reach 12% by 2028, per LBNL. How power demand is changing where and how they get built.
CommercialEV Battery Plant Construction in 2026: Past the Peak
Census manufacturing construction fell 19.8% in the year to Aug 2026. Where EV battery plant construction stands: named plants, cancellations and tax credits.
CommercialHow Much Does It Cost to Build a Grocery Store in 2026?
Grocery store construction costs in 2026, component by component — refrigeration, MEP, finishes — and why the per-SF number swings so hard by region.
CommercialHotel Construction Pipeline 2026: 703,001 Rooms
US hotel construction pipeline 2026: 703,001 rooms and 133,216 under construction at midyear (Lodging Econometrics). Segments, markets, costs and spending trends.
CommercialHow Data Center Construction Differs From Commercial Projects
How data center construction differs from office, retail and hospital work, covering redundancy, medium-voltage power, cooling, commissioning and long-lead gear.
CommercialLab Space Construction Falls 44% to a 2017 Low in 2026
U.S. lab space under construction fell 44% year over year to 4.5M SF in Q2 2026, a 2017 low, as vacancy hit 23.8% (CBRE). What it means for lab contractors.
CommercialLiquid Cooling Is Changing How Data Centers Are Built
NVIDIA GB200 racks run up to 132 kW, and 13% of operators now run 50 kW+ racks (Uptime 2026). What liquid cooling changes for MEP contractors.
CommercialMedical Office Building Costs 2026: The Full Per-SF Breakdown
What medical office construction really costs in 2026 — shell vs medical TI vs full buildout, exam rooms, imaging suites, and the MEP that drives the price.
CommercialMixed-Use Development Construction: What Permits Show
What the permit data actually show for mixed-use development construction in 2026: Census 5+ unit permits, Austin's permit records, Texas SB 840 and California AB 2011, and podium cost drivers.
CommercialPrefab and Modular Data Centers — The Factory-Built Future
Prefabricated power and cooling modules are moving data center work from the field to the factory. What it means for GCs, MEP subs and schedules.
CommercialRestaurant Construction Costs 2026: QSR to Fine Dining Breakdown
What it costs to build a restaurant in 2026, broken down by concept — QSR, fast-casual, full-service and fine dining — with the line items that move the number.
CommercialSelf-Storage Construction in 2026: Slower, Not Stopped
Self-storage construction ran at $6.3B a year in Aug 2026, down 27% from its 2023 peak (Census). Yardi: starts down 20%, rents down 1.6%. Costs and outlook.
CommercialSelf-Storage Construction at $6.3 Billion: Oversupply Risks
Self-storage construction fell to $6.36B in 2025 from $7.21B (Census) and ran at $6.31B a year in Aug 2026. Rents are slipping in oversupplied metros. The data.
Semiconductor Fab Construction and the $52.7B CHIPS Act
The $52.7B CHIPS Act in 2026: $30.9B in fab awards, Intel's grant-for-equity deal, and Census chip-plant construction down 45% to $52.3B a year.
Semiconductor Fab Construction 2026: TSMC, Intel, Micron
US chip and electronics plant construction ran at $52.3B a year in Aug 2026, down 45% (Census). Tracker: TSMC, Intel, Samsung, Micron status and CHIPS awards.
CommercialSports Stadium Construction Spending: The 2026 Pipeline
What US sports stadium construction spending looks like in 2026, with official budgets for the Titans, Bills, Jaguars, Browns and A's and Census recreation data.
CommercialTexas Becomes the #2 Data Center Market — Here's What's Permitted
Texas has solidified its position as the
CommercialData Center Construction Spending: $85B Boom in 2026
Census puts US data center construction at an $85B annual rate in August 2026, up 73% in a year. Who is building, where, and what it means for contractors.
CommercialData Center Foundation Construction and Concrete Demands
What data center foundation construction demands from concrete crews: mass pours, ACI 301 thermal limits, F-number flatness, and a 45,000 CY example job.
CommercialMidwest Data Center Surge: Indiana, Ohio, and Illinois 2026
Midwest data center construction in 2026: AWS's $11B New Carlisle plan, Google's $2B Fort Wayne campus, Indiana and Ohio tax rules, power prices and wages.
Data Center Permits 2026: $85B Pace and Major Projects
US data center construction hit an $85.0B annual rate in August 2026, up 73% from a year earlier (Census). See the sourced tracker: Meta, xAI, AWS, Stargate.
CommercialVirginia Data Center Construction: 2.4 GW Underway in 2026
Virginia data center construction in 2026: 2,420 MW under construction in Northern Virginia per CBRE, JLARC's 63 million sq ft count, Dominion power and taxes.
CommercialWarehouse Construction Slowdown: Down 37% From 2023 Peak
Warehouse construction spending is down 37% from its 2023 peak (Census), but the industrial pipeline grew 23% in a year and vacancy fell to 6.8% (Cushman).
CommercialWhere Every Major Data Center Is Being Built in 2026
Where data centers are being built in 2026, state by state: Atlanta, Northern Virginia, Dallas, Indiana, Louisiana and more, using CBRE and Census data.
EconomyData Center Tax Incentives by State: 2026 Guide
Data center tax incentives by state, checked against statute: Virginia, Texas, Georgia, Ohio, Indiana, Arizona, Nevada, Washington, and Illinois's 2026 pause.
InfrastructureAirport Terminal Construction Projects: 2026 Spending Data
Public spending on airport passenger terminals hit $15.8B in 2025 (Census). Where FAA terminal grants went in 2026, how projects are funded, and what bidders need.
InfrastructureAutonomous Vehicle Infrastructure: What's Being Built in 2026
AV infrastructure in 2026: the $60M federal V2X deployments, Aurora and Kodiak's Texas truck lanes, Waymo depots and JTA's $65M NAVI corridor, with sources.
InfrastructureBike Infrastructure Construction: 2026 Funding and Costs
Bike infrastructure construction runs on the federal TA Set-Aside, about $1.5B in FY2026. What the program funds, how the money is suballocated, and what bike lanes and trails cost per mile.
InfrastructureBEAD Broadband 2026: All 56 Plans Approved, $42.45B
All 56 BEAD final proposals are approved. What the $42.45B program funds after the 2025 restructuring, state allocations, the 4-year build deadline and what contractors should expect.
InfrastructureDam Safety: 2,500+ High-Hazard Dams in Poor Condition
More than 2,500 high-hazard U.S. dams are in poor or unsatisfactory condition (ASCE 2025). Dam repair construction spending, funding and methods.
InfrastructureElectric Grid Construction Spending: $104B T&D in 2025
Investor-owned utilities projected $103.6B for transmission and distribution in 2025 (EEI). Where grid construction money goes, lead times and labor.
InfrastructureEvery Major Bridge Project in the US Right Now — A 2026 Tracker
FHWA rates 41,148 US bridges poor (2026). Tracker: $14.4B I-5 Interstate Bridge, $4.3-5.2B Key Bridge rebuild, $4.4B Brent Spence, $2.3B Calcasieu, and more.
InfrastructureFlood Infrastructure Construction Hits $16.5B Pace
Public dam, levee and shoreline construction ran at a $16.5B annual rate in August 2026 (Census), up 28%. FEMA BRIC status, Corps funding, big projects.
InfrastructureHigh-Speed Rail Construction Costs Top $200M/Mile
California HSR now estimates $35.7B for Merced-Bakersfield, about $209M-$220M per mile all-in. Brightline West is near $96M/mile. What drives the gap.
InfrastructureInterstate Expansion: 7 Projects Total $27 Billion in 2026
Seven verified active interstate expansion projects total $27.3B, led by Houston's $13B I-45 rebuild, plus the $8.9B I-285 award and what contractors should know.
InfrastructureLead Pipe Replacement Construction: 4 Million Lines Left
EPA now estimates about 4 million lead service lines and requires replacement within 10 years under the LCRI. Per-line costs, funding, crew rules and what contractors should know.
InfrastructureNuclear Data Center Construction: The Real Projects
Crane's 835 MW restart for Microsoft, Google's 500 MW Kairos deal, Amazon's Talen and X-energy plans: what nuclear-powered data centers mean for builders.
InfrastructurePipeline Construction Spending 2026: $24B in Oil and Gas
Census puts private oil and gas construction at $24.0B in 2025 and a $24.7B annual rate in August 2026. Gas, water and sewer pipe work, crews and rules for contractors.
InfrastructureRural Bridge Replacement Program: Local Bridges and IIJA
Local governments own about 27,400 of the nation's poor-condition bridges (FHWA). How IIJA's 15% off-system bridge set-aside works, real per-bridge costs and how to win rural bridge work.
InfrastructureSeismic Retrofit Construction: Where Mandates Apply
Mandatory seismic retrofit construction is driven by a handful of local and state laws, not a six-state wave. Where the mandates actually apply — LA, San Francisco, California hospitals, Oregon schools — and where Seattle and Portland stand.
InfrastructureStormwater Infrastructure Construction: The $115B Need
EPA's latest survey puts US stormwater infrastructure needs at $115.3B, with Virginia, California and Florida leading. What gets built, who pays, and where the work is.
InfrastructureThe Broadband Construction Boom: $42 Billion in BEAD Funding
BEAD's $42.45B moves to construction after all 56 plans were approved in 2026. State allocations, the tech-neutral rewrite, build methods, crew rules and what contractors should expect.
InfrastructureEV Charging Station Contractor Opportunities in 2026
EV charging station contractor opportunities in 2026: 79,030 public DC fast ports today, NREL's 182,000 estimate for 2030, NEVI status, and the scope crews actually build.
InfrastructureData Center Water Usage: Millions of Gallons for Cooling
U.S. data centers used 17.4 billion gallons of water on site in 2023 (LBNL); Google's The Dalles campus drew 1.19M gal/day in 2024. What it means for builders.
InfrastructureTOD Construction: 44% of Denver Housing Built Near Rail
44% of Metro Denver's new housing since 2005 sits within a half mile of an RTD station; California's SB 79 legalizes 4-9 stories near rail. What TOD means for builders.
InfrastructureTunnel Boring Projects: 5 Verified Active US TBMs in 2026
We verified 5 TBMs launched or boring on 3 US tunnel projects as of October 2026: Hudson Tunnel, DC Potomac River Tunnel, Seattle Ship Canal. Costs and status.
InfrastructureUS Port Construction Spending: 2026 Grants and Data
US port construction spending: a record $774M in federal PIDP grants for 37 projects in 2026, $488.6M more in the final IIJA round, and Census dock and terminal data.
InfrastructureWastewater Treatment Construction: $150B Plant Need
EPA's 2022 Clean Watersheds Needs Survey lists $150.2B in 20-year wastewater treatment plant needs. Where the work is, how it is funded, and what plant contractors should know.
InfrastructureWater Main Breaks Cost $2.6 Billion a Year: The Backlog
A Utah State University study estimates 260,000 water main breaks a year in the U.S. and Canada, costing about $2.6B. Break rates by pipe, the replacement backlog and funding.
Public WorksMILCON 2026: $19.7 Billion Enacted for Military Construction
Congress enacted $19.7B for FY2026 military construction and family housing. Account-by-account breakdown, the FY2027 request, ATFP rules and how contractors win MILCON work.
Public WorksMunicipal Water System Funding 2026: $257B Plant Need
EPA surveys list $107B in drinking water treatment needs and $150.2B for wastewater plants over 20 years. How municipal water system funding works in 2026 and where plant work comes from.
Public WorksPrison Construction Spending in 2026: Costs and Projects
Prison construction spending in 2026: Census public safety data, Nebraska's $313M 1,500-bed prison bid, Alabama's $1.08B facility, and what drives cost.
Public WorksSchool Construction Spending in 2026: $113B Annual Rate
Public school construction ran at a $113.1B annual rate in August 2026 (Census), after a record $115B in 2025. See the state table, project costs and funding.
Public WorksVA Hospital Construction Backlog: $98B to $109B in Needs
VA puts the cost of closing every facility gap at $98B to $109B. FY2026 enacted and FY2027 requested construction funds, projects, SDVOSB rules, bonding.
CommercialRetail Construction Spending 2026: What Census Data Shows
Retail construction spending 2026: Census puts private store, restaurant and shopping center construction at a $39.1B annual rate in August. Where it is moving.
CommercialCommercial Vacancy Rates 2026: What They Mean for Your Bids
Office vacancy was 19.8% in Q3 2026 (Cushman & Wakefield) and industrial 6.8%. How vacancy by sector changes bid strategy for commercial contractors.
CommercialOffice Vacancy at 19.8%: How Contractors Are Adapting
U.S. office vacancy was 19.8% in Q3 2026 (Cushman & Wakefield), while new office deliveries hit a 30-year low. What the vacancy data means for contractors.
CommercialHealthcare Construction Spending 2026: $75.8B and Cooling
Healthcare construction spending 2026: $75.8 billion annual rate in August per Census, down 3% from a year earlier as private work cools and public spending rises.
CommercialConstruction Material Prices Today: Up 11% as Spending Holds
Construction material prices today: BLS materials index up 11.0% y/y in Sep 2026 while nonresidential spending rose 0.5%. Steel, rebar, copper, lumber, concrete.
CommercialOffice-to-Residential Conversions Up 28%: Which Cities Lead
Office-to-residential conversions hit 90,300 pipeline units in 2026, up 28% (RentCafe). Which cities lead, what conversions cost, and the incentives behind them.
EconomyNonresidential Construction Spending: Flat, Not Down 15%
Census data show nonresidential construction spending at $1.31T in Aug 2026, up 0.5% y/y, not down 15%. Factories fell, data centers and public work rose.
Infrastructure41,148 Structurally Deficient Bridges: 2026 FHWA Count
FHWA's 2026 National Bridge Inventory rates 41,148 US bridges in poor condition (often called structurally deficient). State rankings, repair cost estimates and IIJA bridge funding.
InfrastructureAirport Terminal Construction 2026: $173.9B Needed by 2029
US airports need $173.9B in capital work for 2025-2029, $72.8B of it terminals (ACI-NA). See the JFK, LAX, O'Hare and Pittsburgh projects, costs and dates.
InfrastructureEV Charging Station Construction: Where $7.5B Stands
Federal EV charging money in 2026: $1.4B of $4.2B in NEVI funds obligated, 183 stations open, $503.8M transferred away. What contractors need to know about the work.
IIJA Infrastructure Funding Progress 2026: Status Tracker
Where IIJA money stands in 2026. DOT has obligated 76% and outlaid 47% of its IIJA funds, EPA 72% and 41%. What is spent, what is left, and the December 2026 deadline.
InfrastructureIIJA Infrastructure Spending Tracker 2026: $331B Paid Out
IIJA spending tracker: USAspending shows $607.5B obligated and $330.6B outlaid through August 2026. Agency and program breakdown, GAO findings, and the Dec. 11 deadline.
InfrastructureWater Infrastructure Crisis: $625 Billion Needed in 20 Years
EPA puts drinking water needs at $625B over 20 years and clean water needs at $630B. Where the money goes, lead pipe and PFAS rules, and what it means for contractors.
Labor & WagesConstruction Job Openings 2026: 251,000 Unfilled in August
Construction had 251,000 job openings in August 2026 (BLS JOLTS), down from 299,000 in July. What openings, hires, quits and layoffs say about your crews and bids.
ResidentialHousing Starts Projections 2026: Data-Driven Outlook
Housing starts fell to 1.221M SAAR in September 2026, down 5.2% from August. Year-to-date starts are 1.1% below 2025 and single-family is down 4.0%. Census data and forecasts.
CommercialData Center Construction 2026: $85B Rate, Up 73%
Census puts US data center construction at an $85B annual rate in August 2026, up 73% in a year. Where the work is, which trades it needs, and the power problem.
InfrastructureIIJA Funding in 2026: $331B Paid Out, $608B Obligated
IIJA funding in 2026: USAspending shows $607.5B obligated and $330.6B paid out through August 2026. Where the money went, what lagged and what contractors should do.
ResidentialHousing Starts March 2026: 1.522M SAAR, Up 13.1%
March 2026 housing starts: 1.522M SAAR after revisions (first print 1.502M), up 13.1% from February. Permits fell 11.5%. What the month did and did not signal.