Infrastructure

Top 20 Airport Terminal Construction Contractors 2026
The top 20 airport construction contractors, ranked by $13.9B in 2025 airport revenue from BD+C's Giants 400, with HQs, terminal projects and prequal details.
Sarah Torres · 2026-11-13
InfrastructureHow Accelerated Bridge Construction Works: SPMTs and Slides
How accelerated bridge construction works: SPMT moves, lateral slides, UHPC closure joints, weekend swaps, and what sourced bid tabs say ABC costs.
InfrastructureTrenchless Pipe Installation Cost: HDD to Microtunneling
How HDD, microtunneling, pipe bursting and CIPP get built, what 2025 bid tabs show owners pay per foot, the ASTM and NASTT standards, and where bores go wrong.
InfrastructureDrilled Shafts vs. Driven Piles: Build Method and Cost Per Foot
How drilled shafts, driven piles, CFA piles and micropiles get built, what Texas bid tabs show shafts cost per foot, the ASTM tests behind them, and who does the work.
Key Metrics
Public construction
$546.8B
annual rateValue of public construction put in place, federal, state and local, annual rate. Source: U.S. Census Bureau (via FRED: TLPBLCONS).
Concrete PPI
410.2
indexBLS producer price index for concrete products. Source: BLS Producer Price Index — Concrete Products (via FRED: WPU133).
Iron & steel PPI
392.5
indexBLS producer price index for iron and steel. Source: BLS Producer Price Index — Iron & Steel (via FRED: WPU101).
Highway Spending Trend ($B, annual)
All Infrastructure coverage57 articles
- BESS Construction Guide: Battery Storage and the Fire Code2026-09-25
- How a Substation Gets Built: Cost, Timeline, Trades2026-09-25
- US Tunnel Construction Costs: Why Subways Cost So Much2026-09-25
- Traffic Signal Installation Cost Per Intersection (2026)2026-08-20
- Water Tower Construction Cost in 20262026-08-19
- Sidewalk Installation Cost Per Square Foot (2026)2026-08-17
- Retaining Wall Cost Per Linear Foot (2026)2026-08-16
- Sewer Line Replacement Cost Per Foot (2026)2026-08-15
- Dublin Data Center Moratorium: 22% of Ireland's Power2026-07-20
- Excavation Cost Per Cubic Yard in 2026: DOT Bid Data2026-07-19
- How to Calculate Asphalt Tonnage: $65-$110/Ton in 20262026-07-17
- EV Charging Station Construction Cost: 2026 Guide2026-07-14
- Asphalt Paving Cost Per Square Foot 20262026-07-09
- Airport Runway Construction Cost: $11M to $42M per Mile2026-06-21
- Culvert Replacement Cost: Fish Passage Work and Funding2026-06-21
- Electrical Substation Construction Cost: $7.5M to $97M2026-06-21
- Confined Space Entry: OSHA Construction Rules for 20262026-05-23
- Highway Flagger Wages 2026: Pay, Rates and Rules2026-05-23
- IIJA in 2026: $331B Paid Out, How Contractors Get In2026-04-23
- 41,148 Poor Bridges: IIJA Bridge Money Past the Halfway Mark2026-04-12
- Broadband Construction Contracts: A New Revenue Stream in 20262026-04-12
- Highway Work Zone Safety: New Federal Rules in 20262026-04-12
- Airport Terminal Construction Projects: 2026 Spending Data2026-04-11
- Autonomous Vehicle Infrastructure: What's Being Built in 20262026-04-11
- Bike Infrastructure Construction: 2026 Funding and Costs2026-04-11
- BEAD Broadband 2026: All 56 Plans Approved, $42.45B2026-04-11
- Dam Safety: 2,500+ High-Hazard Dams in Poor Condition2026-04-11
- Electric Grid Construction Spending: $104B T&D in 20252026-04-11
- Every Major US Bridge Project Right Now: 2026 Tracker2026-04-11
- Flood Infrastructure Construction Hits $16.5B Pace2026-04-11
- High-Speed Rail Construction Costs Top $200M/Mile2026-04-11
- Interstate Expansion: 7 Projects Total $27 Billion in 20262026-04-11
- Lead Pipe Replacement Construction: 4 Million Lines Left2026-04-11
- Nuclear Data Center Construction: The Real Projects2026-04-11
- Pipeline Construction Spending 2026: $24B in Oil and Gas2026-04-11
- Rural Bridge Replacement Program: Local Bridges and IIJA2026-04-11
- Seismic Retrofit Construction: Where Mandates Apply2026-04-11
- Stormwater Infrastructure Construction: The $115B Need2026-04-11
- The Broadband Construction Boom: $42 Billion in BEAD Funding2026-04-11
- EV Charging Station Contractor Opportunities in 20262026-04-11
- Data Center Water Usage: Millions of Gallons for Cooling2026-04-11
- TOD Construction: 44% of Denver Housing Built Near Rail2026-04-11
- Tunnel Boring Projects: 5 Verified Active US TBMs in 20262026-04-11
- US Port Construction Spending: 2026 Grants and Data2026-04-11
- Wastewater Treatment Construction: $150B Plant Need2026-04-11
- Water Main Breaks Cost $2.6 Billion a Year: The Backlog2026-04-11
- 41,148 Structurally Deficient Bridges: 2026 FHWA Count2026-04-10
- Airport Terminal Construction 2026: $173.9B Needed by 20292026-04-10
- EV Charging Station Construction: Where $7.5B Stands2026-04-10
- IIJA Infrastructure Funding Progress 2026: Status Tracker2026-04-10
- IIJA Infrastructure Spending Tracker 2026: $331B Paid Out2026-04-10
- Water Infrastructure Crisis: $625 Billion Needed in 20 Years2026-04-10
- IIJA Funding in 2026: $331B Paid Out, $608B Obligated2026-04-04