Where the numbers come from
Every figure on this page is read out of the site’s price dataset at build time — the same file that drives the material price index. That file is produced by the Buildermuse price ETL, which pulls Bureau of Labor Statistics Producer Price Index series from the BLS API and its FRED mirror each month. Only series with a live government source are included; if a series fails to refresh, it keeps its last published value and date. Each panel prints its source at the bottom.
Reading a panel
The tool is built for one question: which of two material groups is moving faster right now? Three quick-compare buttons load common pairs — lumber against structural steel, ready-mix against cement, gypsum against insulation — or you can build any pairing yourself from the two dropdowns. Pick a series in each dropdown and the panel below it fills in with the name, the current index level, the period it belongs to, a month-over-month badge, a year-over-year badge, a sparkline of the stored history, and the source. The color convention is a buyer’s: rising prices render red, falling prices green, flat grey. The sparkline only draws when a material has more than one stored point. The selector groups the series by material family (lumber, steel, concrete and masonry, electrical, general construction). Composite indexes such as the overall construction-materials PPI are kept out of the dropdown; they are on the prices page.
The trend callout
When both panels are filled and both materials have a year-over-year figure, the tool compares them. If the gap is more than one percentage point it prints a banner naming the material with the higher year-over-year number and showing both figures. Because it ranks on the higher number, read the two percentages themselves rather than the wording when both materials happen to be falling.
Compare percentages, not levels
Two index levels never mean anything next to each other. A lumber index of 282 and a steel index of 320 do not say steel costs more than lumber; each number is relative to its own base period. The percentage badges are the comparable part: if one series reads +15% year over year and the other +3%, the 12-point gap clears the banner threshold and the faster mover gets named.
What this is not
It is a trend reference, not an estimate or a price. Nothing here carries regional adjustment, delivery, waste, or labor, and a producer price index says nothing about installed cost. Use it early, when you are still deciding between two substitutable products, then carry the trend forward across a long-lead schedule with the material escalation calculator and record what your suppliers actually charged in the unit price book, which beats any national series for bidding your own market.
Frequently Asked Questions
Are these live supplier quotes?
No. The page reads the site price dataset at build time and shows whatever was in that file when the site was last built. Buildermuse is a static export, so nothing refreshes while you sit on the page, and none of it is supplier-specific or region-specific. Treat the figures as a national reference series for direction and magnitude, then price the actual job from your own supplier numbers.
Why do the two panels show different dates?
Each series carries its own period stamp, printed under its value, and the header separately shows the dataset period. BLS releases most series on the same schedule, but if one series fails to refresh it keeps its last published value and its older date. Check both stamps before you read anything into a difference.
Why are the values index points instead of dollar prices?
Every series in the tool is a BLS Producer Price Index. An index level is a number relative to a base period (1982=100 for most series), not a transaction price, so two index levels are not comparable to each other. Use the month-over-month and year-over-year percentages and ignore the levels.
Why did the trend callout not appear?
The amber banner above the panels has two conditions: both materials must have a year-over-year figure, and the gap between those two figures must be greater than one percentage point. If the two materials are moving at similar rates, the banner stays hidden on purpose rather than declaring a winner on noise.